1 Utama Shopping Mall (New Wing)

Chiller Plant Retrofit & Chiller Plant Control System Retrofit

Chiller Plant Retrofit

  • Supply & replace 3 nos. 2000RT Trane Duplex Centrifugal Chiller c/w 3.3kV Starter.

  • Supply & replace 1 no. 1000RT Trane Centrifugal Chiller c/w 3.3kV Starter.

  • Supply & replace entire cooling towers & Pump sets.

  • Supply & install new VSD for entire cooling towers & pump.

  • Supply & install new Flow Meters, High Accuracy Match Pair Sensor, Energy Meters, Digital Power Meters, and other measuring instruments.

  • Upgrading of existing Motorized Control Valve Panel.


 

Chiller Plant Control System Retrofit

  • Replacement of entire Plant Control System from DDC to Industrial PLC System.

  • Beckhoff PLC Controller to perform entire chiller plant control.

  • Interfacing to various kind of devices via different communication protocol like BACnet IP, MSTP, ADS.

  • High performance Beckhoff Industrial PC for chiller plant efficiency calculation and data processing.

  • Implementing New Scada Software Tridium Niagara and Jace Controller for the new BMS.